Fondamentaux fenêtre sync
Synchronisation turbine connecte générateurs réseau installation RPM holds 2 990–3 010 Naramo Nuclear Plant V2. Vapeur cœur stabilisé 1 420 K drive rotation turbine — sans allumage proper throttle inputs cannot reach bande sync. Watch vidéo embedded New Naramo Update cues UI panneau turbine patches actuels.
Assignez ingénieur turbine dédié séparé opérateur barres — split attention cause RPM hunting failed confirmations gaspillant timers Power Orders.
Sync étape par étape
- Confirmez cœur ~1 420 K coolant feedwater green.
- Augmentez throttle turbine graduellement RPM approche 2 990.
- Ajustez fine petites entrées — avoid overshoot past 3 010.
- Tenez steady bande plusieurs secondes readout stable.
- Press confirm sync panneau turbine announce grid-connected radio.
- Accept Power Orders seulement après bannière sync réussie.
RPM drops sous bande complétion orders may fail instantly — maintain micro-corrections throttle throughout fenêtres orders.
Sync sous pression raid
Raids WN ciblant halls turbine disrupt engineers — SECFOR must hold blast doors DOE continues fine control RPM. Brief backup engineers RPM actuel primary dies combat. Sync during raids high-risk high-reward XP — activate boosters ROADUPDATE before attempts activité raid modérée not overwhelming.
Drills sync vidéo
Mirror throttle inputs vidéo embedded serveurs vides : pause RPM crosses 2 990, predict host overshoot 3 010, resume compare outcomes. Build personal throttle maps — some engineers prefer three large inputs, others eight micro taps. Document style notes app squad mates sub in bio breaks mid-order.
Readiness orders post-sync
Sync réussie not finish line session — Power Orders fail sync band lost celebration chatter. Establish thirty-second silent stewardship sync after grid connection before anyone accepts orders. Confirm statut raid SECFOR radio Z. Only then interact terminals orders. Sequence appears scrims clan DOE advanced separating consistent order farmers one-sync wonders lose band emote spam.
Notes opérations prolongées
Opérations prolongées Naramo Nuclear Plant V2 : 1 420 K, 2 990–3 010 RPM, SCRAM 3 120 K, radio Z, codes (40k, 30K, ROADUPDATE). Archivez 22K. Liste codes alts.
Pratiques débriefing session
Débriefings : above/below 1 420 K, inside/outside 2 990–3 010 RPM, conduits + coolant SCRAM 3 120 K. Bookmark codes actifs. Notes Discord.